JAGTIV · Previous Year Questions

UPSC

GEOGRAPHY · 2014

Previous Year Question

What are the benefits of implementing the ‘Integrated Watershed Development Programme’?

  1. Prevention of soil run-off.

  2. Linking the country’s perennial rivers with seasonal rivers.

  3. Rainwater harvesting and recharge of groundwater table.

  4. Regeneration of natural vegetation.

Select the correct answer using the codes given below.

A.

1 and 2

B.

2, 3 and 4

C.

1, 3 and 4

D.

All of these

Correct Answer: C

Detailed Solution

Statements 1, 3 and 4 represent genuine benefits of watershed development. Linking perennial rivers with seasonal rivers is not an objective of the watershed-development programme.

What is a watershed?

  • A watershed is a geographical area in which all rainfall and runoff drain towards a common outlet such as a river, stream, pond or reservoir.

  • Its boundary is defined by surrounding high ground or a drainage divide.

  • Watershed development involves integrated management of land, water, vegetation and human activities.

  • Its principal purpose is to retain rainwater within the local area, improve soil moisture and restore land productivity.

Statement 1: Correct

Watershed development prevents soil runoff and erosion.

The following interventions are commonly undertaken:

  • Contour bunding along lines of equal elevation.

  • Construction of contour trenches and terraces.

  • Check dams and gully plugs across small streams.

  • Farm ponds and percolation tanks.

  • Plantation of grasses, shrubs and trees on slopes.

  • Development of vegetative barriers on agricultural land.

These measures:

  • Reduce the velocity of surface runoff.

  • Protect fertile topsoil from being washed away.

  • Control gully and ravine erosion.

  • Reduce sediment deposition in rivers and reservoirs.

  • Provide more time for water to infiltrate into the soil.

Therefore, Statement 1 is correct.

Statement 2: Incorrect

Linking perennial rivers with seasonal rivers is not part of watershed development.

  • River-linking projects are large-scale inter-basin water-transfer schemes.

  • They may involve large dams, barrages, canals and pumping infrastructure.

  • Watershed development focuses on local management of rainfall, soil and vegetation within a small or micro-catchment.

  • River interlinking and watershed development are therefore distinct concepts.

Therefore, Statement 2 is incorrect.

Statement 3: Correct

Rainwater harvesting and groundwater recharge are major benefits of watershed development.

  • Check dams, percolation tanks, farm ponds and contour trenches retain rainwater.

  • Stored water gradually infiltrates into the ground.

  • This recharges shallow aquifers.

  • Water levels in wells and tube wells may improve.

  • Soil moisture remains available for a longer period.

  • Opportunities for rabi crops and multiple cropping increase.

  • Drinking water and water for livestock become more reliable during dry periods.

Therefore, Statement 3 is correct.

Statement 4: Correct

Watershed development assists the regeneration of natural vegetation.

  • Afforestation and assisted natural regeneration increase vegetation cover on degraded slopes.

  • Grazing regulation and community-pasture development support the recovery of grasses and shrubs.

  • Plant roots bind the soil and reduce erosion.

  • Vegetation intercepts the direct impact of raindrops.

  • Availability of biodiversity, fodder, fuelwood and minor forest produce may improve.

  • Increased vegetation cover improves the local microclimate and the biological quality of the land.

Therefore, Statement 4 is correct.

Other important benefits

  • Higher productivity of rain-fed agriculture.

  • Improved drought resilience and water security.

  • Crop diversification and the possibility of second and third crops.

  • Development of livestock, horticulture and agroforestry.

  • Reduction in intense flood runoff and waterlogging.

  • Rural employment and local livelihood opportunities.

  • Long-term community-based management of natural resources.

Evolution of the programme

  • Different drought-prone, desert-development and wasteland-development programmes were integrated under the Integrated Watershed Management Programme.

  • It was subsequently incorporated into the Watershed Development Component of the Pradhan Mantri Krishi Sinchayee Yojana.

  • The contemporary approach extends beyond water conservation to land treatment, livelihoods, community institutions and climate-resilient agriculture.

Continue practicing free PYQs with your JAGTIV account.